Chronology Unplug Patch cores in CO Nest Apartment
(OSP Metro Permata RW 05)
To explain the chronology of Loss dB Complex RW05 Metro 1 will be described as follows:
1. At the date of 28-10-2016 at around 15:00 pm, has been implemented Test straightness in CO Nest to ODC RW07 and Rw11 implemented by jointer PT.APJ involving a patch test on unplug core (Core Patch Metro Permata RW 05).
2. After pengetasan finished, the team did not reassemble the core patch (Patch Core Metro Permata RW 05). Thus resulting in the loss dB side ODP site Metro Permata RW05.
3. October 29, 2016 ZTE receive Complain of the team FO IndosatM2 around 19:00 pm informing that the ODP are connecting with new customers by FO team has a dB loss.
4. From this condition, ZTE team immediately responded and analyze complaints from point 3.
5. Team ZTE came to the site and improve complaint on October 29, 2016, at 21.00 pm with how to reinstall the patch cords in unplug by team jointer subcon ZTE (Patch Core for site Metro Permata RW 05) at the site CO Nest.
So this chronological actually delivered. thanks.
正在翻譯中..
