Including:1. The transport of FAT from the Warehouse to the local MSM to job sites.2. Mounting the FAT above the Foundation.3. The creation of the Foundation of the FAT suit design.4. Includes the FAT label and accesories5. This Item outside of the connection and termination.6. FAT Complete set held by PT. MSM.
正在翻譯中..