Number : 001/IFV/PT.ADT/VII/2015

IRON ORE MINING SERVICE


Undersigned below
Name : Xu Xiangping
Position : Project Manager
Company : PT. ADIDAYA TANGGUH
Address : Gedung Wisma Indocement lt.15, Jl.Jend. Sudirman Kav.70-71, Setiabudi, Jakarta Selatan 12910
Hereinafter reffered to as the Employer;

Base on :
1. Contract number 01/CK-ADT/KONT-TAMB/IV/2015 date on 16th April 2015.
2. Meeting between ADT & CK on 8th June 2015

With this command :
Name : PT. CIPTA KRIDATAMA
Address : Gedung Tiara Marga Trakindo (TMT) 2, 3rd Floor, Jl.Cilandak KKO No.1, Jakarta 12560.
Which this case is represented by : Budi Sutresna

Hereinafter reffered to as the Contractor;


To immediately start work with the provisions as follows :


Type of Work : Excavation 200,000 ± 20,000 in Beneficiation Plant Area, disposal to Owner decided location, bulldozer follow the Owner’s instruction to do leveling work on disposal place.
Start for Mobilization : Latest in End of August 2015.
Start of Work : 1 Nov 2015 31 Dec 2015.
Deadline finished : 31 Dec 2015
Job Results : Reports and acceptance certificates.
Pricing : Based on the topsoil unit price in IRON ORE MINING
SERVICE AGREEMENT
Terms & Conditions : Following to IRON ORE MINING SERVICE AGREEMENT
Excavation Scope : Attached drawing section 1 to 28
Dumping Distance : inner 1000 meters
Original Topo survey : decided by jointly topo survey


Jakarta, 29 July 2015




Employer Contractor
PT. ADIDAYA TANGGUH PT. CIPTA KRIDATAMA




Xu Xiangping
Project Manager Director
0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
NSTRUCTION FOR VARIATIONSNumber : 001/IFV/PT.ADT/VII/2015IRON ORE MINING SERVICEUndersigned below Name : Xu XiangpingPosition : Project ManagerCompany : PT. ADIDAYA TANGGUHAddress : Gedung Wisma Indocement lt.15, Jl.Jend. Sudirman Kav.70-71, Setiabudi, Jakarta Selatan 12910Hereinafter reffered to as the Employer;Base on :1. Contract number 01/CK-ADT/KONT-TAMB/IV/2015 date on 16th April 2015.2. Meeting between ADT & CK on 8th June 2015With this command : Name : PT. CIPTA KRIDATAMA Address : Gedung Tiara Marga Trakindo (TMT) 2, 3rd Floor, Jl.Cilandak KKO No.1, Jakarta 12560.Which this case is represented by : Budi Sutresna Hereinafter reffered to as the Contractor;To immediately start work with the provisions as follows :Type of Work : Excavation 200,000 ± 20,000 in Beneficiation Plant Area, disposal to Owner decided location, bulldozer follow the Owner’s instruction to do leveling work on disposal place. Start for Mobilization : Latest in End of August 2015. Start of Work : 1 Nov 2015 31 Dec 2015.Deadline finished : 31 Dec 2015Job Results : Reports and acceptance certificates.Pricing : Based on the topsoil unit price in IRON ORE MINING SERVICE AGREEMENTTerms & Conditions : Following to IRON ORE MINING SERVICE AGREEMENTExcavation Scope : Attached drawing section 1 to 28Dumping Distance : inner 1000 metersOriginal Topo survey : decided by jointly topo surveyJakarta, 29 July 2015 雇主承包商磅超级大国艰难磅悉普塔 KRIDATAMA徐向平项目经理总监
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: