Chronology of the core Patch Unplug The CO's Nest Apartment (OSP Metro Gems RW 05)To clarify the chronology of the occurrence of Complex dB Loss Metro 1 RW05 will be outlined as follows:1. on the Date 2016-10-28 at around 15.00 BST, has been implemented in the kelurusan Test CO. Nest to ODC RW07 and Rw11 implemented by jointer PT. APJ which involves a core patch testing in unplug (Patch Core Metro Gems RW 05).2. After the pengetasan is complete, the team does not reattach the core patch (Patch Core Metro Gems RW 05). Resulting in loss of dB ODP site beside the Metro RW05 Gem.3. October 29, 2016 ZTE received Complain from IndosatM2 FO team at around 19.00 WIB informs that the ODP that will be connected with new customers by team FO have a dB loss. 4. from this condition, ZTE team immediately responded and analyze complain from point 3. 5. Team ZTE came to the site and fix complain on 29 October 2016, at 9 pm with a means of resetting the patch cord that is on unplug by team jointer subcon ZTE (Patch for the Core site Metro Gems RW 05) in site CO Nest.So chronologically is delivered with real. Thank you.
正在翻譯中..
