Dear Mr. Xie and Team, at Nanning
According your email latest I have Propose and question :
1. For the BH at centre line river I propose change with left and right and plus 1 BH at upstream and 1 BH at downstream, please give coordinate or position (if agree), see drawing.
2. Bridge for water and road at Malawang River make 4 BH, see drawing.
3. Haw many depth Bore Hole maximum at Weir
4. Haw many sample for laboratory testing every BH
5. Haw about soil investigation for canal, need or no BH or hand auger only.
Notes:
BH = Bore Hole
Best Regards,
Nursidin
Pada Senin, 29 Juni 2015 20:59, Ir Nursidin menulis:
Dear Mr. Xie and Team, at Nanning
According your email latest I have propose and question :1. For the BH at centre line river I propose change with left and right and plus 1 BH at upstream and 1 BH at downstream, please give coordinate or position (if agree), see drawing.
2. Bridge for water and road at Malawang River make 4 BH, see drawing.
3. Haw many depth Bore Hole maximum at Weir.
4. Haw many sample for laboratory testing every BH.
5. Haw about soil investigation for canal, need or no BH or hand auger only.
Notes:
BH = Bore Hole
Best Regards,
Nursidin
Pada Selasa, 23 Juni 2015 20:55, Ir Nursidin menulis:
Pada Jumat, 19 Juni 2015 13:51, Ir Nursidin menulis:
mohoh pak yitno, terjemahkan kata kata dari Cina ini. Trims.
Pada Selasa, 16 Juni 2015 9:31, service menulis: